– Embankments which have been artificially stabilized by the reinforced earth system.
– Paving the collector roads as this is a highway with full access control.
– Intersections with cross streets at different levels, raising the main road surfaces.
– Execution of eight bridges corresponding to each intersection with the cross streets and the two main access points to the Football Stadium.
– Signage and demarcation throughout the highway, cross streets and collector roads.
– Street lighting
– Waterproofing irrigation works
– Land expropriation measures necessary to carry out the proposed work.
– Mensuras para Expropiación necesarias para llevar adelante la obra proyectada.