Doubling the existing road along 35 km of the National Road 14 as part of the corridor in the provinces of Entre Rios and Corrientes.
The basic work and surfacing has a crowning width of 11.30 m composed of a paved roadway of 7.30 m, outer shoulders of 3 m (2.5 m surfaced and 0.50 m ground covered with grass) and an inside shoulder of 1 m wide covered with soil and grass.
The work included forest clearing, grubbing and land clearance, building embankments with and without special compaction, tack and bituminous primer with EM-1, special layers, two black asphalt concrete footings of 0.08 m and 0.07 m respectively and also road surface of asphaltic concrete 0.06 m thick.