We built the sewage treatment plant of the third basin near the city of Bahia Blanca
We built the sewage treatment plant of the third basin near the city of Bahia Blanca
Earthworks
Meters of concrete
Volume of steel
installed hydroelectric capacity
Third basin sewage treatment plant, Bahía Blanca
Province of Buenos Aires
Aguas Bonaerenses S.A. (ABSA)
Construction of a sewage treatment plant near the city of Bahia Blanca located on an area of 800 m to the southwest on kilometer 696 of National Road 3.
Liquids treated for the new plant are driven by a collector channel – also constructed as part of this contract- to its final destination, the Arroyo Saladillo de Garcia which discharges into the estuary of Bahia Blanca.
The installations included the following structures: pumping station equipped with three submersible vertical centrifugal single stage pumps, desander, equipartidora camera, two aerobic reactors with blowing rooms, sand drying, two secondary clarifiers, mud drier, contact chamber with corresponding chlorination building, auxiliary facilities (workshop, laboratory, command room). Internal, communications, peripheral wall and power lines of 13.2 kV.