
21 Ene Latest progress
El Tambolar
We are building the El Tambolar Hydropower Plant to ensure the provision of vital resources such as water and energy for the province of San Juan.
Lying on the San Juan River near the town of Pachaco, El Tambolar will be the fourth dam on the San Juan River and its reservoir is billed to have the largest volume in the province (605 hm3), expanding the region’s irrigation capacity and reducing the effects of droughts or flooding.
The hydroelectric plant will produce an average of 343 GWh/year of electricity which will be sold to the national grid.
Watch the video here.
Sorry, the comment form is closed at this time.