WE HAVE 65 YEARS OF EXPERIENCE TO OUR CREDIT IN CONSTRUCTION AND WORKS MANAGEMENT IN THE FOLLOWING AREAS:

HIDROPOWER  |  VIAL  |  SANITATION |  MINING OIL & GAS  |  ARCHITECTURE  |  OTHER

1800

MW INSTALLED

POWER

75

MILLION M3 OF EXCAVATED EARTH

MOVING WORK

3000

KM ROADS

BUILT

INSTITUTIONAL VIDEO 

RECENT NEWS

A work that joins Punta Negra’s & Caracoles dam and creates a new tourist circuit in San Juan

viasferreassantafepanedilefront

The Joint Venture formed by Panedile and TESUR which belongs to the Techint Group, acquired equipment for the tasks of repair and improvement of the Gral. Belgrano Railroad in the province of Santa Fe as well as for future railway projects

26.10.2017

NoticiaIliaPanedile

Panedile is to build the new fast lane on the Illia Highway in the section between the toll at Retiro and Avenida 9 de Julio in Buenos Aires

31.03.2017

HIGHLIGHTS

TeatrodelBicentenarioSanJuanPANEDILE

After four years of construction and thanks to the work of more than 700 professionals, technicians and local workers, the Teatro del Bicentenario is ready for Opening Night with the presentation of “Carmina Burana” performed by the European theatrical group La Fura dels Baus.

21.10.2016

BecasPanNot

Panedile and Cimientos open the invitation for students to apply for the Ing. Juan Carlos Dragonetti scholarships.

18.03.2016